Hi Don,
Question,
What do I do with the 2 wires that are to be attached to the battery, per OEM instructions, (temp senseor wiring), one for the MS MPPT CC and the other for the Mag 2012 invertor?
If I understand these instructions correctly, they say I have to have a small wire attached to one of the battery posts etc.
Tia,
Don H
pianotuna wrote:
Hi,
Method #3 uses wires to a buss. Connect all the other wires to the buss.
Roy B,
Thanks for the info on the buss bars and I believe the fuse holder, I am planning on doing the same as you did on you install as I have an 8 and 16 ton crimper for the lugs.
What are these cable marker labels, Need info,
I like the idea of marking the cables for future info down the road,as I have a lot of cables/wiring to make up, and this electical thing is NOT my best area.... as I am getting kinda long in the tooth, as they say.
What is the Blue colored tool?
I had planned on using these type of connectors for the smartgage battery system, as I could run/attach all battery cables to one point,
see info here:
http://www.ebay.com/itm/310814483377
Thanks to ALL you guys, your info is greatly helping me to finish my solar install, as hunting season is just around the corner, again.
Tia,
Don H