MEXICOWANDERER
Sep 26, 2014Explorer
Landyacht's Flame-O-Watt (A thought)
When installing the new transistors...
After bonding (screwing them) to the heat sink...
You DID use a DMM and insure with a resistance check that the continuity between the metal -tab- of the replacement TO220 transistors and the heat sink was open circuit, right? The tab is where the device has a hole for a screw to pass through and clamp the device to the heat sink.
After bonding (screwing them) to the heat sink...
You DID use a DMM and insure with a resistance check that the continuity between the metal -tab- of the replacement TO220 transistors and the heat sink was open circuit, right? The tab is where the device has a hole for a screw to pass through and clamp the device to the heat sink.