Thanks, T 2 roll,
Will check out that info.....
I have sent the MS site an email listing my PV spec's,
wire run lengths and battery's size etc,
and ask for the correct info for running of PV panels, 60a MPPT CC,
wire lengths and size etc.
Awaiting their reply.
Now have to figure out the proper sized CB/fuzes for everything being used etc,
to have disconnects from PV panels, CC and batteries,
along with the correct wire sizes etc.
Then finish the tilt rods etc, build/weld the battery rack for underneath the TH frame,
then move the TH into the shop so I can attach the pv panels and work down from there.
And of course take lots of photo's in each step of the install plus correct notes of everything etc, to help anyone else who may to decide to go down this road.
It will be the least I can do for the ongoing help I have received from the members etc.
I have until Oct 1st to finish everything, when hunting/trapping season starts etc.
Will do several dry runs during the summer to fix/correct any pending problems that may show up.
Tia,
Don