Day 27
I got a early start this morning. Actually got up before breakfast.
Here is the AIR stuff install over the right valve cover and the vacuum solenoids that control the EGR, AIR & fuel vapors over the left valve cover.
The blue thing on the upper left is a BBK adjustable fuel pressure regulator. May need to up the fuel pressure a touch. Time will tell.

Next is the two wiring harness the run across the top of the engine with one harness going to the transmission.

Finally the throttle body, EGR valve and control cables get installed.

That just about takes care of the stuff on top of the engine for now.
Next is the various components on the front of the engine.
Here it is bare, waiting for me to get busy. The rag is to keep junk out of the distributer hole.

Didn't get much installed on the front of the engine today. Just the AIR pump and bracket.

The pile of parts in the garage keeps getting smaller. We shall see what tomorrow brings.
Stay tuned
Richard