Forum Discussion
mikestock
Aug 02, 2015Explorer
With 100 ft-lbs applied to the flexing extension and only 99.5 ft-lbs resistance supplied by the nut, something (i.e. the nut)has to be moving and will continue to move until the imbalance is gone and the system is static. We have always assumed the wrench to be turned on a parallel plane to the nut.
About Technical Issues
Having RV issues? Connect with others who have been in your shoes.24,343 PostsLatest Activity: Dec 13, 2025