Ok guys here is what I have, and what I want to do.

I have two 120 watt panels running through a 10 year old PWM charge controller to a set of two group 27 deep cycle 12 volt Trojans.

I also have the original 50 watt panel that came with the camper siting unplugged.

I just purchased the Rouge 2024 MPPT controller. I am going to run the 120 watt panels through the Rouge controller to the group 27s.

So now I have the original 50 watt panel along with original PWM controller. I want to wire this up to the same battery bank. My questions are in regards to proper wiring.

Do I run the wires from both controllers straight to the battery?

Or do I run the wires from both controllers through a set of 12 volt circuit breakers then run them separately to the battery?

Or do I run the wires from both controllers through a set of 12 volt breakers then join the wires together then to the battery ?

Maybe I need to fuse the leads and don't need the breakers at all?