Forum Discussion
MNtundraRet
Aug 06, 2013Navigator
I forgot the one other problem. This is all to fit in the size and weight limit of a Class B motor-home. Class A is possible but very expensive.
And then there is the cost. An electric site costs about $5.00/day more than non-electric at best. The 4KW generator in my MH would cost more than that for AC use of more than 4 hours in a 24 hour period. I solve the problem getting an electric site or heading for the U.P. of Michigan in hot weather.
Since I am nearing 70 I think I will have better luck waiting for a fuel-cell to replace the generator.
And then there is the cost. An electric site costs about $5.00/day more than non-electric at best. The 4KW generator in my MH would cost more than that for AC use of more than 4 hours in a 24 hour period. I solve the problem getting an electric site or heading for the U.P. of Michigan in hot weather.
Since I am nearing 70 I think I will have better luck waiting for a fuel-cell to replace the generator.
About Technical Issues
Having RV issues? Connect with others who have been in your shoes.24,276 PostsLatest Activity: Jun 26, 2025