ScottG wrote:
Tom/Barb wrote:
When we did our coach hook-up we ran 3 #4 cable RED/White/ and Black in hard conduit about 50 feet, We installed a 50 amp dual phase Circuit breaker in our master panel, then ran the conduit out thru the wall and attached it to the house, and ended at the Out door service box for the coach, enclosed is 4 way receptacle.
We also carry a 50' ready made 50 amp extension chord. It's some thing we thought we needed, but never use.
That would have been single, split phase service.
Cheers,
Scott
ScottG posted dual phase 50 amp breaker, likely not inspected, as would be not code compliant without a GROUND!!!.
With a setup like this even if "Hard Conduit" metal with threaded couplings, I would not trust for a ground, unless one used bonded bushings at each end.