Forum Discussion
Dave_Pete
Jan 07, 2015Explorer II
Since the previous post in this thread we've got the camper front box wall in, and work on the galley refrigerator cabinet well under way. Now some of the pieces of the fridge cabinet were ready for paint, most specifically: the lower shelf parts, the left wall and the cabinet enclosure itself.
Most of the paint was primer, but there are a few dark bronze pieces, in this case the lower shoe compartment. These will need a second coat of dark bronze, and then a couple coats of mahogany tinted poly, and then they can be assembled.
While waiting for paint to dry - and the bronze does take a full 24 hours between coats - I'll be working on other projects. I had to flip the camper around again to get easier access inside now that the front wall is back in. See that flip and a workshop regroup under "Structure and New Wood".






Most of the paint was primer, but there are a few dark bronze pieces, in this case the lower shoe compartment. These will need a second coat of dark bronze, and then a couple coats of mahogany tinted poly, and then they can be assembled.
While waiting for paint to dry - and the bronze does take a full 24 hours between coats - I'll be working on other projects. I had to flip the camper around again to get easier access inside now that the front wall is back in. See that flip and a workshop regroup under "Structure and New Wood".






About Travel Trailer Group
44,052 PostsLatest Activity: Nov 23, 2025