Forum Discussion
Yosemite_Sam1
Sep 19, 2019Explorer
stsmark wrote:
They all have s sweetheart deal with the local utilities. It was part of the package of incentives to build in that area.
If you are talking of Nevada, the new administration just passed a bill to make the state source 50% of it's energy needs from renewables by 2030.
And new incentives for installing solar.
The windy Washoe Valley is ideal for wind farm (shown in design rendering in Tesla Gigafactory).
@Turtle n Peeps, design rendering is what the architect and owner envision as the FINAL look at the project once completed. Gigafactory is still a work-in-progress when the photo was taken and it will be for sometime as it is built and expanded as needed. (scalable)
About Travel Trailer Group
44,056 PostsLatest Activity: Jan 01, 2026