Forum Discussion
time2roll
Feb 14, 2022Nomad
valhalla360 wrote:Yes and that would be part of the install if that is what the business determined was the best and most profitable plan.
Except, it's often the main feed to the park that is limited. 2-3 fast charging stations may require an additional 400-500amps with a main feed that is already struggling during peak summer conditions.
Take a look at a fast charger area. Virtually all have a main transformer dropped right there for what is needed.
Don't forget the utility actually likes to expand their business. Not an issue.
About Travel Trailer Group
44,051 PostsLatest Activity: Oct 02, 2025