JRscooby wrote:wapiticountry wrote:JRscooby wrote:
Stupid question; If a CG is upgrading sites from 30 too 50 Amp, how much extra cost to also add capacity to charge EVs? Bet most have made/are making that change so I assume they have run the numbers and are betting the upcharge for site with upgraded power will pay off.
Electricity costs are negligible. It the cost to upgrade the electrical infrastructure that is going to make RV parks reluctant to fully embrace EVs. I would much rather miss some potential business than come out of pocket with $50,000 or more to upgrade the electrical system when there isn’t a clear need.
You missed the point of my question; A CG has 30 Amp sites, decides they want to have more of the 2 AC units stop instead of going down the road. If they are trenching, and pushing pipe to run the extra wire for the 50 AMP service to sites, how much extra money would it take to also put in charge ports?
The trenching would be the same. The copper cost would be double if they use the KOA approach of a 40 amp EVSE on each pedestal. But really, this is a 30 year transition. If they put EVSE’s on a third of the pedestals they would probably be covered for the next 20 years.
Jmho. Not an expert.
About Travel Trailer Group
44,029 PostsLatest Activity: Jan 28, 2025