Well my solar is installed and running, minor hiccups and a wtf but its all sorted out. 3 hours start to finish with two guys working on separate projects until we needed four hands. First the hiccups:The PO install had the original charge controller mis wired so it lead to a WTF after we had everything installed and wired up and the new charge controller read "over voltage condition" The volt meter showed 24 volts.
Up on the roof we were mystified the lines were in parallel. I isolated one panel 24 volts same with the other.
Went online, controller is designed to handle 12 and 24 volt panels and sense system voltage and provide the correct one so I do have 24 volt panels, We figured out the mis wiring due to the previous system and corrected it, the controller is now showing normal condition whew. Last time I will ever trust that the previous owner did the proper wiring.
The old wiring had the controller inside a cabinet in a useless place and the wirring...yuck. The new controller is mounted on the cabinet in the step up week to the cabover and the wiring is now in a plastic conduit anchored to the side wall out of the way on the inside.
After some discussion and though about how I put the kayaks on the roof we put the panels above the cabover on either side of the sky light screwed and sealed with dicor into the Lance Aluminum frame
Still to be completed is the install of a vent cap as branch protection over the OEM roof plug and covering the exposed wires with dicor to attach them to the roof and prevent wind flutter and to seal all the electrical connections with a dicor seal