Tom Orlowski wrote:
That's it done. Deposits in the mail. Dan at Polar RV in Salem NH.has been awesome. It has been a long time coming. Looking forward to a bathroom were I have a little more leg room. They said it should be in around mid September. Hopefully ready to go Duck Hunting in Vermont mid Oct. Possible overnight visit to the FryeBurg fair in Maine. I ordered the Gen Ready Option. Has anyone done the same? To later install the generator possibly later themselves. The Gen Set was just way over budget.
Congratulations. Mine has the genset ready option as well. No real use for it but the wires don't get in the way too much in the storage compartment.