Forum Discussion
westend
Feb 04, 2016Explorer
You can test the operation of the converter by supplying 120V power to the converter, insuring that this circuit is closed to the converter, i.e. the converter has 120V input.
Set your meter to DC volts and measure output of the converter on those terminals on the converter or across the battery posts (+,-). You should measure above 13.5 DCV.
Set your meter to DC volts and measure output of the converter on those terminals on the converter or across the battery posts (+,-). You should measure above 13.5 DCV.
About Travel Trailer Group
44,052 PostsLatest Activity: Nov 23, 2025