Forum Discussion
12thgenusa
Jul 13, 2013Explorer
Hey, you have the same trailer as I. The first time I pulled mine down, I cut it into three sections. At one split, I added an aluminum angle spanned between the frame I-beams. At the other I added a metal strip to one end of the cut piece to have something to screw into with the other piece. Yes, it is a pain to pull down the iron propane pipe, but a must. When everything was reinstalled I put strips of Gorilla tape over the split lines.
I've actually had the whole thing down three different times. The section over the axles is the hardest to reposition.
This thread should probably be in a different forum.
I've actually had the whole thing down three different times. The section over the axles is the hardest to reposition.
This thread should probably be in a different forum.
About Travel Trailer Group
44,029 PostsLatest Activity: Jan 21, 2025