Forum Discussion
apr67
Apr 30, 2013Explorer
I use a combination.
The problem with Lynx is that they sink into the sand over time. So I use a strip of PT Plywood to put on the ground first. Then I use the Lynx if I need more lift. I also created a 2x6 box with lid to hold 10 lynx levelers. I turn box upside down, empty the levelers on the ground put the box under the stab and add lynx's to it, usually about 5 on each rear stab. The front stabs just get lynxs.
The problem with Lynx is that they sink into the sand over time. So I use a strip of PT Plywood to put on the ground first. Then I use the Lynx if I need more lift. I also created a 2x6 box with lid to hold 10 lynx levelers. I turn box upside down, empty the levelers on the ground put the box under the stab and add lynx's to it, usually about 5 on each rear stab. The front stabs just get lynxs.
About Travel Trailer Group
44,030 PostsLatest Activity: Feb 04, 2025