Aug 20, 2020Moderator
well, yesterday I got the panel mounted and cables ran down to the charge controler. Decided to step up the battery side cable to 8 ga so I had to go have a couple of thoes made and I should be able to have it all running today. in about 3 weeks I am going to be loading up the camper and touring around Alberta, so that will be a good test as it should be cool enough at night for the furnace.
mounting system for screws that dont hit a stud

panel all mounted and sealed in

panel wires done.

MPPT controler mounted with battery temp sensor and bluetooth cables conected.

grabbed two of these 30A breakers to use as disconects. I put one on the positive panel wire and one on the positive battery wire.

Steve
mounting system for screws that dont hit a stud

panel all mounted and sealed in

panel wires done.

MPPT controler mounted with battery temp sensor and bluetooth cables conected.

grabbed two of these 30A breakers to use as disconects. I put one on the positive panel wire and one on the positive battery wire.

Steve