I'm not one to walk around on my roof, discovered the soft spot just by placing my hands on it. Today I reinstall the rubber roof. Keeping my fingers crossed everything goes well. I did notice that the factory ran some staples though the top of the rubber roof, under where the trim goes. Most of the stapling was done after it folded down over the back wall. Why anyone would staple the top and possibly allow a water entry point is beyond me? My plan is to run a strip of eternabond across the rear edge of the roof and cover any staple holes. Then install the trim and Dicor it.