I wanted to hear what you had to say. The unpainted DRV’s are delivered to MORRyde to be aligned that’s it.
The frames are delivered to DRV with the IS installed.
When I took my DRV to them to have the 3” risers installed they ripped off the entire brake line system and installed it properly as DRV does a lousy job.
I can post pics later.