Forum Discussion
oldtrucker63
Feb 20, 2012Explorer
I placed my Ordered today, a Waste holding tank 30 gallon and the Waste Holding Tank - Grommets - 3" and 2" and also a RV Sewer Cable Actuated Waste Valve - 3" with a 72 inch cable, I have already received the courtesy lights for the steps and the generator Stop/Start switch with hour meter and the Toilet floor flange and seal, Now I just sit here and wait for the right weather to set in and then start to work, I think the first thing will be to install the black tank and then get the rear bumper set up for the generator and the Honda 5.5 HP engine and Air compressor, There is a lot of work to get done with only about 6 weeks to finish this, I at least want to get it finished enough to where we can go camping, I can always do the little things as we go.