Forum Discussion
bjcarpetguy
Jul 30, 2012Explorer
Well actually been over the past week. Wife had a corner cabinet in
bedroom with a sink in it. Was really hard to get around to get in and out of bed. So I took it out as the bathroom is only about 3 feet
from it. Got it out and decided since I had hot and cold water to
install an outdoor sower kit. Got that done took out the pocket door and reinforced the wall to install a new wall mount tv. Finished
that task put in new wall, havn't finished the trim yet but will b4 long.
Next task was to find out why I had know power to my GFCI in bath and
exterior. I installed it upside down the first time. Works now.
Then took out a pull out hamper in bath and built in shelves for
towells instead.
Took today off to have lunch with Daughter and Boyfriend. They told
us she is PG. Oh Well there at least 21 and both work so good luck.
Next is too reseal several windows. Take rear AC unit and Put it
up front and put in a vent in rear.
Would have had this all done awhile ago but here in the Puget sound
it has rained since November.
Got to finish all of this by end of month as we will be leaving to
start going south getting to Q by around 1st of Nov.:B
Would liked to have had all this done
bedroom with a sink in it. Was really hard to get around to get in and out of bed. So I took it out as the bathroom is only about 3 feet
from it. Got it out and decided since I had hot and cold water to
install an outdoor sower kit. Got that done took out the pocket door and reinforced the wall to install a new wall mount tv. Finished
that task put in new wall, havn't finished the trim yet but will b4 long.
Next task was to find out why I had know power to my GFCI in bath and
exterior. I installed it upside down the first time. Works now.
Then took out a pull out hamper in bath and built in shelves for
towells instead.
Took today off to have lunch with Daughter and Boyfriend. They told
us she is PG. Oh Well there at least 21 and both work so good luck.
Next is too reseal several windows. Take rear AC unit and Put it
up front and put in a vent in rear.
Would have had this all done awhile ago but here in the Puget sound
it has rained since November.
Got to finish all of this by end of month as we will be leaving to
start going south getting to Q by around 1st of Nov.:B
Would liked to have had all this done
About Motorhome Group
38,708 PostsLatest Activity: Mar 04, 2025