Forum Discussion
Replant
Feb 26, 2011Explorer
Still plugging along. The cab-over is officially rebuilt and today I finished putting down a sub-floor for the Allure oak flooring. The Wain-Scot paneling will take forever because they need 3 coats of Minwax finish.
We have carpeting for the B/R,cab and steps which have been completely rebuilt and a Fan-Tastic remote controlled roof fan to replace a defective roof vent. The to-do list goes on. :B
We have carpeting for the B/R,cab and steps which have been completely rebuilt and a Fan-Tastic remote controlled roof fan to replace a defective roof vent. The to-do list goes on. :B
About Motorhome Group
38,707 PostsLatest Activity: Feb 17, 2025