smkettner wrote:
If the meter says 12.3 or less by all means start the generator.
That covers 12.11 showing 12.2 volts.
Once generator is started let voltage climb over 14 and run one additional hour. Or just run it 2 to 3 hours. That will get you through the night.
Or if you really want a 100% charge run the generator all night because that is how long it takes.
Does it matter if you are 87% or 92% charged? If it does maybe more battery is needed.
Understood. I was thinking in terms of the abs voltage being steady, as in c.v./abs mode. Perhaps your charger has rising voltage throughout the charge? Or perhaps you're referring to rising volts during boost, and then one hour of abs?
This is the weird thing going on with my pm4b... steadily rising voltage, up to the abs set-point, until near full charge, all while amps are tapering... Not exactly the typical 3-stage charging algorithm. What stinks is it's doing a real number on the charge rate because of the lower, slowly rising voltages.