Probably best to buy a second panel with controller and run both sets of wires to the battery.
Otherwise you'll need to access the controller input wires to connect the second panel. Panels should be identical and the controller has to be spec'd for 2 panels and you may void any warranty.
Very common to connect panels in parallel, series or series parallel with 2 wires going to an appropiate controller.