way2roll wrote:
Not just hearsay, I've heard of real cases of things getting screwed up when running the genny and shore power at the same time.
โDec-11-2020 02:25 PM
โDec-11-2020 01:33 PM
โDec-11-2020 01:14 PM
โDec-11-2020 12:04 PM
โDec-11-2020 11:12 AM
time2roll wrote:
Anytime you start the generator it is a hot transfer unless you turn everything off including the converter and electric water heater. You could use the main breakers to cut power and save the transfer switch but then someone will say the breakers should not be used as a switch either. As I said the list never ends.
โDec-11-2020 10:50 AM
โDec-11-2020 10:30 AM
โDec-11-2020 10:28 AM
time2roll wrote:
The list of systems that could be connected wrong is endless.
Do you verify everything else before you turn stuff on?
Truthfully if something this important is wired wrong I would prefer to know sooner than later.
There is no rolling of the dice. Wires do not jump off terminals and rewire themselves.
โDec-11-2020 08:37 AM
โDec-11-2020 08:04 AM
time2roll wrote:MrWizard wrote:Ok so if the generator does not have priority the worst case would be no load on the generator.
"Transfer switch shouldgive priority to the generator"
Now that is the stickler, the word should , if it doesn't , bad things could happen, that is why you unplug first
Nothing bad will happen either way. Otherwise get back into the manual and read about how a transfer switch works.
โDec-11-2020 07:43 AM
โDec-11-2020 07:33 AM
MrWizard wrote:Ok so if the generator does not have priority the worst case would be no load on the generator.
"Transfer switch shouldgive priority to the generator"
Now that is the stickler, the word should , if it doesn't , bad things could happen, that is why you unplug first
โDec-11-2020 06:30 AM
MFL wrote:pianotuna wrote:
Hi,
Unplug.
Exerise.
Replug.
30 minutes @ 50% load, after a 3 minute warm up.
This is how I do it too. Always best to be safe.
Jerry
โDec-11-2020 05:08 AM
MrWizard wrote:
"Transfer switch shouldgive priority to the generator"
Now that is the stickler, the word should , if it doesn't , bad things could happen, that is why you unplug first