**UPDATE 09/17/2020***Well I haven't posted lately since I've been in overdrive mode trying to get this project finished in time to get a little camping done this year.
We got the slide back in, mainly by sliding it up a 2x10 onto a sawhorse, bringing the low side onto another saw horse, then adding blocks until it was high enough for the the mechanism to extend under it. The slide itself had no leaks or water damage, so all that was needed was a carpet delete from the storage hatch.
We finished up the painting on the inside along with the carpet delete. I put in a click-lock vinyl plank floor and used that same floor on the slide out platform. The area under the couch that is outside storage got peel-n-stick tile. The inside of the slideout got wallpapered, the couch is back in, and the step up to the dinette that used to be carpeted is now done in pine with a new piano hinge.
The space behind the propane storage was the perfect size for a beverage cabinet so I finished off the inside with the melamine hardboard:
The cabover got self-stick tile along with the DuraGrid under the mattress.
The 811 was designed for an old 13" tube TV that you put in the over sink cabinet on a turntable, then rotate to view either from bed or dinette. I screwed the front-facing door to the cabinet frame, then added a SuperSonic 1080p TV that runs on 12v, along with a new KIng antenna. We no longer used our Roku at home since getting a smart TV, and as luck would have it the wall wart for that was rated at 12v, so I cut it off and wired the Roku right into 12v.
I mounted the TV on the cabinet door with an articulating mount that allows the TV to swing around for dinette viewing.
Added a stereo since the speakers and pre-wiring was already there, and replaced the CO detector with a battery operated one. I used that space where the CO detector used to be to mount the switch for the TV and cig lighter and USB charging ports.
Lastly we got the filon installed and the windows in on the left side.
Last bit of BIG NEWS is that we got the gas turned on!! Fridge lit right up! Stove works and the furnace is awesome!
Left to do at this point:
1. re-wire the tailights and replace the umbilical cord.
2. Re-install HW heater and misc hatches on the left side.
3. Get all the trim back on and sealed.
4. Eternabond EVERYTHING
Hoping to be done by the end of the month, but we'll see....