Forum Discussion
hybrid_dw
Jan 15, 2018Explorer
So after consulting and studying the conditions, my plan is to leave the Foam intact and shore it up. The Luan/Foam/Masonite sandwich board is the heart of the structure and other than the top luan layer being damaged and /or gone, I can replace that layer on top of the intact foam, secure it and roof over the back 6 feet. I will remove the trim and replace EPDM full width of the unit.
Heres images of how I will shore up the sagging assembly around the skylight openings. Back to back 1.5 inch aluminum angles. this wont effect headroom in the bathroom as well.
Heres images of how I will shore up the sagging assembly around the skylight openings. Back to back 1.5 inch aluminum angles. this wont effect headroom in the bathroom as well.
About Travel Trailer Group
44,029 PostsLatest Activity: Jan 21, 2025