Forum Discussion
NRALIFR
May 10, 2021Explorer
I think before I would mess with drilling holes and injecting epoxy, since you’re going to have to replace the floor covering anyway I’d just cut out everything down to the bottom ply of the subfloor and replace it with plywood subfloor material. I would confine the cutting to the open/walkable floor area unless there was water damage that needed to be fixed.
:):)
:):)
About Travel Trailer Group
44,029 PostsLatest Activity: Jan 28, 2025