Forum Discussion

mountainkowboy's avatar
Apr 23, 2011

The S&S/Red Restore/Update/Repair Thread

Today started the "make it ours" portion of our new to us 1990 S&S 11 SCB. I started by replacing cheap plastic Therford toilet that was in the wetbath with an oval lid porcelain Therford toilet. What a pain that was, not only was it gross under the old unit, but the convertion of the water supply line was a pain to.

Next I tore all the drapes out, along with all the upolstery. Then I vacumed every nook and cranny out, removed all the drawers and vacumed in there too.

The short list of parts so far is;
NEW BATTERY
CO/PROPANE ALARM
REBUILD KITS FOR JACKS
MATERIAL FOR DRAPES
SHOWER CURTAIN
WALL MOUNT BRACKET FOR FLAT SCREEN
NEW RADIO AND SPEAKERS
LOTSA CAULK AND SILICONE

Pics to follow worked till dark.