Run time will be determined by the air conditioner power draw and battery capacity. Many use higher voltage battery banks to reduce the need for extremely heavy cables. Host has a number of off-grid packages that be pre-installed and are listed on the website. Those wanting more or something different, go the custom route alone or with a third party.
Host Mammoth 11.5 on Ram 5500 HD