afidel wrote:
ACZL, if I'm going the 8/12 route why not just stay on 90 until the 8/12 exit, why bother with 365? Looking at 365 I was thinking I'd take it all the way to the merger with 8 and avoid Utica.
I mentioned it because others spoke of 365. Yes you can stay on the T-way until exit 31 (Utica) and p/u 8/12 north. IMO, not really any good places for diesel fuel at this exit if you use it. After you come thru cashbox, you'll veer right, go under 90 and a sharp right for ramp. FOLLOW signs. Same directions as my previous post about 8/12 from here applies.
You could still get off at x33 and p/u 365 and just stay on it until 8, but here's my thought on it. Once you get off the 4 lane 365, it's not too awful bad at 1st of a road. But it then starts to have quite a few turns, small/med pulls, then levels out some. Then you have a very good downhill into village of Barneveld with a stop at bottom in town. Turn left and stay on 365. My bad some here as I haven't been on 365 east from Barneveld in years and frankly forgot it ran into 8. I just know that 8 north goes thru Poland and the route in my 1st post is how we go to Poland w/ our rig. Just a lot less of brakes, sharp turns and back tracking (at least for us if we stayed on 365 to 12 south to 8 north).