Forum Discussion
TXiceman
Oct 03, 2014Explorer II
If you are getting an attorney, ask them to produce the stress and load calculations for the fram as designed and with an extra 50# on the back. First off, I doubt if they can produce a set of stress/load calculations on the frame design.
In the frame calculations, do they have fluid tanks full, 1/2 full or empty and then how do they allow for cargo loading in the front bay or in the trailer.
You may find they do not have an engineer on staff capable of running the calculations and they did not bother to get an outside consultant.
Ken
In the frame calculations, do they have fluid tanks full, 1/2 full or empty and then how do they allow for cargo loading in the front bay or in the trailer.
You may find they do not have an engineer on staff capable of running the calculations and they did not bother to get an outside consultant.
Ken
About Fifth Wheel Group
19,006 PostsLatest Activity: Jan 29, 2025