Forum Discussion
gbopp
Sep 04, 2016Explorer
I just did some work on our 96 Southwind. I ran 2" Eternabond along the roof edges and overlapped it about 1/2" on the rain gutter.
I also ran some lengthwise 4" patches/reinforcement. I overlapped them about 1/4".
Use a straight edge and make a light pen mark on the roof or Eternabond. It makes applying it much easier with a guide to follow.
Use a roller to press it down, it will last a very long time.
I also ran some lengthwise 4" patches/reinforcement. I overlapped them about 1/4".
Use a straight edge and make a light pen mark on the roof or Eternabond. It makes applying it much easier with a guide to follow.
Use a roller to press it down, it will last a very long time.
About Fifth Wheel Group
19,033 PostsLatest Activity: Jan 24, 2026