A coworker ordered a Jayco class A back in September and was first told early December. Then January, February, March etc. It finally arrived at the dealer last week, with a build date of April 22.
He went and had the PDI and when he sat down for the final paperwork, found out that the price had increased a little over $6K from his quote / paperwork signed when ordered last fall. He asked if they would honor the original price quoted and the answer was no, take it or leave it. He left it.
Prices are rising rapidly due to material shortages and material prices. Plywood prices have increased as much as 425% in less than 3 months and are not expected to ease until the 3rd quarter of 2022. I have heard that by mid summer steel, aluminum, and rubber will all be in short supply with prices for all going through the roof.
He went and had the PDI and when he sat down for the final paperwork, found out that the price had increased a little over $6K from his quote / paperwork signed when ordered last fall. He asked if they would honor the original price quoted and the answer was no, take it or leave it. He left it.
Prices are rising rapidly due to material shortages and material prices. Plywood prices have increased as much as 425% in less than 3 months and are not expected to ease until the 3rd quarter of 2022. I have heard that by mid summer steel, aluminum, and rubber will all be in short supply with prices for all going through the roof.