Bobo_Div
Aug 10, 2015Explorer
HW surge protector installation
Progressive HW 30A installation at Prism 24g
I have three 12/2 wires in the 30A receptacle box, one from generator, one from
converter and shore power cable.
Converter suppose to have transfer switch.
Coachmen tightened shore power cable and gen output cable together and
converter to the receptacle.
My dilemma is : input at surge protector will be wires from shore power cable
and output Romex 12/2 from generator ( w/o additional transfer switch ) and output at surge protector Romex 12/2 to the converter. Correct or incorrect
I have three 12/2 wires in the 30A receptacle box, one from generator, one from
converter and shore power cable.
Converter suppose to have transfer switch.
Coachmen tightened shore power cable and gen output cable together and
converter to the receptacle.
My dilemma is : input at surge protector will be wires from shore power cable
and output Romex 12/2 from generator ( w/o additional transfer switch ) and output at surge protector Romex 12/2 to the converter. Correct or incorrect