Forum Discussion
RGVBaptist
Oct 31, 2014Explorer
EXECUTIVE: That's an old photo. Right property, but an old photo. The green yard at the bottom of the image is where the church is actually built (not in that photo). Everything else in that long rectangle is part of the church property.
No. We are flexible on dates. Winter, obviously. You don't want to be here doing yardwork in the summer when it's 115 degrees! :)
We will provide any necessary tools.
We will provide any necessary materials.
The site is full hookup (water/sewer/electric), but does not include cable.
We are flexible. It's ongoing work.
I won't say it's 100% required, but it would be preferred.
deltamaster wrote:
Do you have time-frames for start and quit?
No. We are flexible on dates. Winter, obviously. You don't want to be here doing yardwork in the summer when it's 115 degrees! :)
deltamaster wrote:
Do you have equipment or tools other than basic hand tools?
We will provide any necessary tools.
deltamaster wrote:
Do you have a budget for materials, acquisition sources, etc?
We will provide any necessary materials.
deltamaster wrote:
Is the site full hookup (water, sewer, cable included)?
The site is full hookup (water/sewer/electric), but does not include cable.
deltamaster wrote:
When must the work be completed?
We are flexible. It's ongoing work.
deltamaster wrote:
Must the applicant be of the Baptist faith?
I won't say it's 100% required, but it would be preferred.
About RV Tips & Tricks
Looking for advice before your next adventure? Look no further.25,177 PostsLatest Activity: Aug 30, 2022