I have a battery cut-off switch installed between battery bank positive distribution post (all batteries cabled to posts with equal length cables) and the main distribution block (where I have the feeds from 2 solar controllers, house main, inverter). My question is, I assume that I would need to cut off the positive feeds from the solar panels to the MPPT controllers before switching off access to the batteries?
If so, can I install same type of cut-off switches to each controller - one is wired at ~ 30 volts from a single 250w panel, the other gets ~ 90 volts from 2 x 325 panels wired in series.
If so, can I install same type of cut-off switches to each controller - one is wired at ~ 30 volts from a single 250w panel, the other gets ~ 90 volts from 2 x 325 panels wired in series.