Well, after much thought, considering all the above, today I bit the bullet and spent some $$$. DW doesn't know how much yet. Wait 'till she sees the VISA bill. :E Oh well, we'll be on our way south by then and it will be too late to do much about it :B Except :M Better think about Brownie Point possibilities.
TriStar TS-MPPT-45 and Bogart Engineering Tri-Metric TM-2030 and Shunt.
This will mean moving all but the critical stuff from the electrical compartment. Inverter, Transfer switch, and 50A shore power cable. Everything else to another bin. Which means removing something else. There must be something we can leave behind.
It's booked in to the tech for the 4th of October, ten days before we hope to head south.
I'll update again when it's working.
TriStar TS-MPPT-45 and Bogart Engineering Tri-Metric TM-2030 and Shunt.
This will mean moving all but the critical stuff from the electrical compartment. Inverter, Transfer switch, and 50A shore power cable. Everything else to another bin. Which means removing something else. There must be something we can leave behind.
It's booked in to the tech for the 4th of October, ten days before we hope to head south.