Kayteg1 wrote:
time2roll wrote:
You can have the city inspect your work if you have any concerns.
I am General Contractor and not expert in electrical, but did electrical in the past.
When I think your technical conclusion is correct, from the experience I can tell the City Inspector does not have to have electrical knowledge, although he might.
What inspectors do is checking out the build with the design, meaning you need to design and have it approved by Building Department for the inspection.
The Dept should have qualified planer who can elaborate on the design in their office.
Codes change from state to state and from city to city, so you can never tell....
Yes in my experience if you want a city inspection the city will require written drawings to review and a fee to be paid before the inspector comes out. And I think the OP will probably get perfectly good guidance if asking nicely at the city permit counter of the building code department.