ScottG
Mar 29, 2018Nomad
Smart meter?
I helped a buddy install a 200A service on a camping lot he bought. I also wired in the classic "100A" RV panel with 50/30/20A outlets. (all to code, permitted and inspected) Here's the rub, since ...
ScottG wrote:Generally with the SM the power company can know close to real time load on the transformer. This allows the transformer to be replaced if it starts to run over the design max.
I know what a SM is. My question is, since it is metered by a Smart Meter, what happens if we exceed 7KW?