Forum Discussion
Reisender
Jul 27, 2022Nomad
Here's the map. Pretty much everything on the south side is in. We have charged at many of them. The north side (north of highway 16) is still coming. Big project, and only about a 6 month work window. Yukon is working on it from their side as well.

I just read a little blurb that speculates that about a third of these are the 25 kw safety sites. Useful but not a great place to charge.
This is a typical 25 KW safety site. Usually 2 x 25 KW CCS and Chademo machines and apparently the new ones also have a J1772 level 2 7.2 KW unit. Its the little unit on the right.

This is what many of the BC hydro sites will be like. This is a single charger site but apparently most will be duals. These are typically 50 KW machines. This is Rogers pass BC. Hard to believe with all that snow we took this in June. :) This was from our cross Canada trip.


I just read a little blurb that speculates that about a third of these are the 25 kw safety sites. Useful but not a great place to charge.
This is a typical 25 KW safety site. Usually 2 x 25 KW CCS and Chademo machines and apparently the new ones also have a J1772 level 2 7.2 KW unit. Its the little unit on the right.

This is what many of the BC hydro sites will be like. This is a single charger site but apparently most will be duals. These are typically 50 KW machines. This is Rogers pass BC. Hard to believe with all that snow we took this in June. :) This was from our cross Canada trip.

About Travel Trailer Group
44,056 PostsLatest Activity: Dec 27, 2025