Forum Discussion
Dennis12
Jun 20, 2017Explorer
"Also on any slab you should saw cut the slab within 24 hours 1/4 of the thickness of the concrete and after 24 hours you should saw cut the slab 1/3 of the thickness of the concrete to control cracks that do ac-cure."
This is taken out of the ACI book (American Concrete Institute.) Overall National Code that most professionals go by.
In general concrete is guaranteed to get hard and guaranteed to crack but you should do everything to minimize the problem
This is taken out of the ACI book (American Concrete Institute.) Overall National Code that most professionals go by.
In general concrete is guaranteed to get hard and guaranteed to crack but you should do everything to minimize the problem
About Travel Trailer Group
44,034 PostsLatest Activity: Jun 05, 2025