I had a concrete pad poured for my TC to park under. 5.5" thick, fiber, rebar grid 12" on center, 5,500 psi concrete and I let it cure for 30 days before they erected the canopy. I also used cure n seal so the concrete wouldn't dry out too quickly as it cured. Had two saw cuts to prevent cracks. Did I mention that I hate cracked concrete?