Thank you guys for all your responses and pointers. I will break out the table saw and see what turns up. I have only two weeks left and repairing this thing is very slow. I keep finding compromised sections that I can't leave unrepaired.
so far,
I removed all silicone beads (were falling off anyway) from the exterior and used polyurethane. Replaced and waterproofed all lights.
Removed cabinets
Removed linoleum and replaced all subfloor minus the section under the bed.
Wanted to self level the subfloor, install wall and ceiling paneling and paint the roof 5 times this weekend but all i was able to get done was plane out the new subfloor joints and paint the roof 2 times because I had to replace the floor and wall near the tongue.
Thanks again,