Forum Discussion
darsben
Jan 14, 2015Explorer II
The price is good now the work begins. If your first rig ask them to throw in.
Sewer hose and fittings at least 20 foot, Water hose, Pressure reducer. Wheel chock(s) Jacks if not built in etc.
You need to do a thorough predelivery inspection BEFORE PAYING where you make sure Everything I mean everything works. IF not 100% then no final payment till fixed
Sewer hose and fittings at least 20 foot, Water hose, Pressure reducer. Wheel chock(s) Jacks if not built in etc.
You need to do a thorough predelivery inspection BEFORE PAYING where you make sure Everything I mean everything works. IF not 100% then no final payment till fixed
About Travel Trailer Group