Basically, this:
October 2020 - Ms. Merry Update
Mind you that's about a week old, now, so more has been done. In this case, the structural 2x3 in the wall on the cabover has been installed to support the over counter cabinet, and the 1/2" plywood backing board has been installed flush so that the paneling could then be glued and anchored over the top, allowing for the start of construction on the cabinet frame today.
October 2020 - Ms. Merry Update
Mind you that's about a week old, now, so more has been done. In this case, the structural 2x3 in the wall on the cabover has been installed to support the over counter cabinet, and the 1/2" plywood backing board has been installed flush so that the paneling could then be glued and anchored over the top, allowing for the start of construction on the cabinet frame today.