Forum Discussion
JoeChiOhki
Oct 23, 2020Explorer II
Got the upper cabinet above the kitchen area framed in last weekend. Going to finish the job, panel the front wall below the cabover and put in the insulation sheet (3/5" foil faced polyisocyanurate) and 1/8" plywood overlay on the wing bottom where the kitchen is going so I can start running the hot and cold water lines and electrical circuits and not have a giant cold sink inside our cabinets.
About Travel Trailer Group
44,057 PostsLatest Activity: Mar 12, 2026