Forum Discussion
JoeChiOhki
Apr 29, 2022Explorer II
This is the last few days:
- Completed installation of corner trim and ceiling trim in everywhere but the cabover
- Installed the middle wire shelf in the over dinette cabinets and made support pieces to hold it up (its narrower than the depth of the cabinet)
- Finished installing the maple cabinet face frames for all cabinets but the cabover cabinet (Still has some construction work to do)
- Installed about 50% of the corner molding
- Installed the new rubber roof cover on the snap-n-nap so that its fully sealed again and caulked the edges of all the screw strips that seal it to the camper
- Installed the new maple face board on the Fridge, replacing the original fake oak panel that came from Mr. KIT.
- Made the first of the new birch plywood drawer boxes for the kitchen drawers
- Purchases the birch wainscotting for the lower dinette surround
- Cut the maple cap piece of the short wall by the dinette and fridge and demarkated on it where to route in the recess
- Installed the Trojan J185h-ac 12 volt deepcycle to complete the battery bank and made the negative battery cable for it.
About Travel Trailer Group
44,052 PostsLatest Activity: Nov 04, 2025