Forum Discussion
rastaman33609
May 07, 2016Explorer
So after what seems to have been forever, going at a snails pace when compared to 'Sliver'. I am happy to report that the interior is just about complete.

the back splash is stainless

on the rear wall I mounted tongue and grove ceder boards

Laminate flooring


the electrical is all complete including a new controller and some lighting. all fused through a 12 volt control panel.
Plumbing is complete and functional.
It has actually turned out better than I hoped, I am very pleased.
Next will be sealing up the exterior, roof coating, window seals, and configuring some sort of exterior gray water storage.

the back splash is stainless

on the rear wall I mounted tongue and grove ceder boards

Laminate flooring


the electrical is all complete including a new controller and some lighting. all fused through a 12 volt control panel.
Plumbing is complete and functional.
It has actually turned out better than I hoped, I am very pleased.
Next will be sealing up the exterior, roof coating, window seals, and configuring some sort of exterior gray water storage.
About Truck Camper Group
286 PostsLatest Activity: Apr 30, 2026